B. Label each fixture, lighting outlet, distribution device and dimmer module with unique
designation. Make designations on elevated components readable from floor.
3.4 FIELD QUALITY CONTROL
A. Manufacturer’s Field Service: Engage a factory-authorized service representative to inspect, test
and adjust field-assembled components and equipment installation, including connections, and to
assist in field testing. Report results in writing.
B. Schedule electrical tests and visual and mechanical inspections with at least seven days’
advance notice.
C. Visual and Mechanical Tests and Inspections:
1. Inspect each fixture, outlet, module, control and device for defects, finish failure,
corrosion, physical damage, labeling by nationally recognized testing laboratory, and
nameplate.
2. Exercise and perform operational tests on mechanical parts and operable devices
according to manufacturer’s written instructions.
3. Check tightness of electrical connections with torque wrench.
4. Verify proper protective device settings, fuse types and ratings.
5. Record results of tests and inspections.
D. Electrical Tests: Perform tests according to manufacturer’s written instructions.
1. Continuity tests of circuits.
2. Operational Tests: Connect each outlet to a fixture and a dimmer output circuit so each
dimmer module, dimmer control and output circuit, outlet, and fixture in a typical
operating mode will be sequentially tested.
E. Correct deficiencies disclosed by tests and inspections, and retest deficient items. Verify that
specified requirements are met.
F. Test Labeling: After satisfactory completion of tests and inspections, apply a label to tested
components indicating test results, date and responsible organization and person.
G. Reports: Prepare a schedule of lighting outlets by number; indicate circuits, dimmers, connected
fixtures and control-channel assignments. Prepare a schedule of control settings and circuit
assignments for house control channels. Prepare written reports of tests and observations.
Report defective materials, workmanship, and unsatisfactory test results. Include records of
repairs and adjustments made.
3.5 CLEANING
A. The Contractor shall remove all paint spatters and other spots, dirt and debris from the
equipment. Clean equipment and devices internally and externally using methods and materials
recommended by the manufacturer.
3.6 CONTRACTOR STARTUP AND REPORTING
A. Contractor shall prepare and submit a complete set of record drawings, operation and
maintenance data and certificates as outlined in this section.